Lincoln City Police Facility

A Coastal Civic Building Designed for Resilience

Lincoln City Police Facility

Lincoln City, Oregon
The Lincoln City Police Station presents a resilient civic façade with cedar shingles, accessible entry routes, and a distinctive folded roofline.

Project Overview

The Lincoln City Police Station gives the City of Lincoln City a purpose-built facility shaped by the demands of public safety and the character of the Oregon Coast. FFA designed the mass timber police station to support clear workflows, strengthen connections among department personnel, and create a welcoming civic presence on a steep, constrained site. Located outside the tsunami inundation zone, the building pairs long-term resilience with durable coastal materials, an expressive cross-sloped roof, and warm cross-laminated timber interiors. Its compact organization also allowed police operations to continue in the former station throughout construction.

Planning for Safety Beyond the Tsunami Zone

Lincoln City’s police department had operated from a former ambulance garage that could no longer effectively support modern public safety work. The City needed a purpose-built station with secure circulation, appropriate technology, better staff spaces, and room for the department’s varied operational needs.

The location of the new station was an early and consequential decision. FFA and the City evaluated two potential sites, considering public access, operations, ownership, and exposure to coastal hazards. The selected City-owned property placed the station outside the mapped tsunami inundation zone, strengthening the department’s ability to serve the community following a major coastal event.

The site also contained the existing police station, which needed to remain fully operational during construction. FFA developed a compact building footprint and carefully coordinated site plan that preserved vehicle access and allowed officers and staff to continue working from the former facility until the new station opened. This phased approach made continuity of service a central design requirement, not a logistical afterthought.

Dense coastal forest near Lincoln City features tall conifers, moss-covered trunks, and a shaded woodland floor.

Cascade Head rises above the Oregon Coast, with forested cliffs, rocky sea stacks, and misty ocean views.

Client engagement board compares private offices, open workstations, and shared workspaces with sticky-note feedback on privacy, flexibility, and preferred workplace features.

Translating Community Values into Design

FFA refined an earlier concept and programming study through conversations with police personnel, City leaders, staff, and community members. Workshops with officers provided insight into daily routines, shared spaces, security requirements, and the physical and emotional demands of police work. A public open house expanded that dialogue through a presentation on Lincoln City’s history, opportunities for residents to share stories, and visual preference exercises.

Three themes emerged from this process: resilience, professionalism, and a connection to the natural coastal environment. FFA translated those ideas into an architectural concept inspired by water moving around rocks along the shoreline. The building’s strong, grounded exterior forms represent stability, while shifts in its roofline and circulation respond to the site’s movement.

This concept gave the station an identity rooted in Lincoln City without relying on literal coastal imagery. It also helped connect decisions about massing, materials, landscape, and interior atmosphere to values expressed by both the department and the community.

Fitting a Police Station into a Steep, Active Site

The sharply sloping site required the building to reconcile public access, secure police operations, vehicle movement, and construction phasing within a limited area. FFA organized the station as a compact bar nestled into the hillside, using the grade change to separate public and operational functions.

Fitting a Police Station into a Steep, Active Site The sharply sloping site required the building to reconcile public access, secure police operations, vehicle movement, and construction phasing within a limited area. FFA organized the station as a compact bar nestled into the hillside, using the change in grade to separate public and operational functions.

Visitors approach from the higher side of the site and enter the upper level, where the public lobby and multipurpose room are readily accessible. Police personnel move between work areas on this level and secure vehicles housed below. This vertical organization shortens operational routes while maintaining clear boundaries between public, staff, and secure areas.

The building’s placement also kept the former station accessible during construction. Once the new facility opened, the City removed the old structure, leaving that portion of the property available for a future addition. The resulting site plan addresses immediate operational needs while giving the City a practical framework for long-term growth.

An extended accessible ramp follows the slope toward the public entrance. Rather than treating the grade change as an obstacle, the design integrates the route with planting and stormwater features, creating a gradual and engaging approach to the building.

Schematic rendering of the Lincoln City Police Station shows the building stepping with the wooded hillside, with screened windows, accessible paths, and coastal-inspired forms.

Organizing the Building Around an Officer’s Day

The plan grows from the sequence of an officer’s daily work. Staff arrive through secure areas, move between vehicles and the upper floor, access lockers and equipment, participate in briefings, complete reports, meet with colleagues, and respond to calls. Organizing these functions around those recurring movements reduces unnecessary travel and supports quick transitions.

At the center of the department, the break room serves as a shared gathering place. Locker rooms, briefing space, conference rooms, and work areas cluster around it, making informal connection part of the building’s daily rhythm. This arrangement reflects the importance of communication and mutual support in a workplace where personnel may otherwise spend much of their shifts dispersed throughout the community.

Public functions remain easy to identify without compromising operational security. The lobby creates a clear point of contact, while the multipurpose room accommodates meetings and other community-facing uses. Together, these spaces balance openness with the controlled circulation required of a modern police facility.

The Lincoln City Police Station lobby features warm mass timber walls and ceilings, comfortable seating, and filtered daylight through vertical wood screens.

Lincoln City Police Station staff work in a light-filled open office framed by mass timber walls and ceilings.

A fitness and locker area at the Lincoln City Police Station features mass timber ceilings, natural light, and integrated strength-training equipment.

Rendering of the Lincoln City Police Station briefing room shows officers gathered in a light-filled training space with warm wood ceilings and large windows.

Construction team members inspect the Lincoln City Police Station briefing room as the hybrid steel and mass timber structure takes shape.

Lincoln City Police Station’s completed briefing room features a warm mass timber ceiling, high clerestory windows, and flexible seating for training and staff meetings.

 

Giving Coastal Resilience an Architectural Form

The station’s exterior responds to the Oregon Coast’s weather, colors, and textures. Concrete shingles wrap the building in a durable gray surface reminiscent of coastal rock. The material was selected to withstand salt air and moisture while supporting the project’s fire-resistance goals. Exterior metals were similarly detailed with the corrosive marine environment in mind.

Above, the folded roof rises and shifts across the length of the building. Its geometry reduces the station’s apparent scale, follows the site’s movement, and gives the public facility a recognizable civic presence. At dusk, light from the entrance and interior workspaces softens the exterior’s solidity and signals that the department remains active around the clock.

The landscape extends this approach to resilience. Roof runoff is gathered at two primary locations and directed toward a bioswale near the public entrance, making stormwater management visible within the arrival experience. Plantings mediate between the building, accessible ramp, parking areas, and surrounding trees while reinforcing the station’s connection to its coastal setting.

Construction crews install the mass timber roof structure of the Lincoln City Police Station against a forested coastal hillside.

 

Making a Complex Roof Work in Mass Timber

Cross-laminated timber became part of the design after the initial concept phase, introducing both structural and experiential opportunities. The system reduced embodied carbon while keeping wood surfaces exposed throughout key interior areas. Against Lincoln City’s often gray skies, the natural material brings warmth, texture, and reflected light into the workplace.

The team resolved the roof’s intersecting planes through detailed structural coordination and used prefabrication strategies to reduce field labor and streamline installation on the constrained site.

Inside, exposed timber works alongside steel framing, polished concrete, light-colored finishes, and a restrained coastal palette. Large windows bring daylight into shared workspaces and connect personnel with the surrounding trees, providing visual relief within a highly focused operational environment.

A daylit open office at the Lincoln City Police Station features exposed mass timber walls and ceilings, tall windows, and collaborative workstations.

A staff member moves through a daylit Lincoln City Police Station corridor lined with glass-fronted offices, warm wood trim, and a mass timber ceiling.

Supporting Focus, Documentation, and Well-Being

Police workplaces place specialized demands on interior environments. Interview rooms require careful coordination of cameras, microphones, finishes, and furniture placement so interactions can be recorded accurately. Cameras positioned at different heights capture both seated participants and broader activity within the room. The balance of hard and absorptive surfaces improves speech clarity, including when someone speaks quietly or looks downward.

Acoustic performance was also important in open work areas, particularly dispatch. Following occupancy, FFA worked with Acoustic Design Studio to identify sources of reverberation and add targeted wall treatments. These adjustments significantly reduced echo and helped create a calmer, more functional environment for work that depends on sustained concentration and clear communication.

Daylight, exterior views, exposed wood, and comfortable shared spaces support another form of performance: the well-being of the people using the station each day. These elements create a professional workplace that acknowledges the intensity of public safety work while supporting focus, collaboration, and connection.

The Lincoln City Police Station glows at dusk, with a shingle-clad façade, landscaped entry, and clear civic presence.

Project Impact

The Lincoln City Police Station provides a safer, more functional, and more supportive home for the department while establishing a distinctive civic presence on the Oregon Coast. Community-informed design, durable materials, mass timber construction, and careful site planning connect resilience with daily operations. The completed facility reflects the professionalism of its users while remaining grounded in the landscape and identity of Lincoln City.

Project Details

18,500 sf
2020 completion

Image Credit

Christian Columbres